Charging
Up to 22 kW three-phase, limited to 11 kW on delivery. Your electrician can unlock 22 kW if your connection allows it. The 6 m Type 2 cable is permanently attached. Integrated MID-compliant energy meter.
1 item
go-e accessories €6.90, free from €400 order value. €300,10 to go, e.g. with a wallbox.
View your legal guarantee rights (EU notice)




Savings calculator Compare wallboxes
View your legal guarantee rights (EU notice)
Installation is not included in the price unless it is expressly listed as part of the service.
StromNow does not provide its own guarantee. Your statutory warranty rights remain unaffected.
Secure paymentPersonal adviceWithdrawal information
Choose options
Savings calculator Compare wallboxes
View your legal guarantee rights (EU notice)
Installation is not included in the price unless it is expressly listed as part of the service.
StromNow does not provide its own guarantee. Your statutory warranty rights remain unaffected.
Secure paymentPersonal adviceWithdrawal information
Savings calculator Compare wallboxes
View your legal guarantee rights (EU notice)
Installation is not included in the price unless it is expressly listed as part of the service.
StromNow does not provide its own guarantee. Your statutory warranty rights remain unaffected.
Secure paymentPersonal adviceWithdrawal information
Up to 22 kW three-phase, limited to 11 kW on delivery. Your electrician can unlock 22 kW if your connection allows it. The 6 m Type 2 cable is permanently attached. Integrated MID-compliant energy meter.
Wi-Fi, LAN and LTE are built in. According to go-e, at least 5 years of mobile connectivity are included free of charge. Control via the go-e app, open API, Modbus TCP, MQTT and OCPP 1.6. According to go-e, the hardware is prepared for Plug & Charge and V2X in accordance with ISO 15118; the functions will be provided later by software update.
For wall or pedestal mounting. The supply cable can enter from the top, bottom or rear. Installation by a qualified electrician.
Integrated residual current detection with 20 mA AC and 6 mA DC. IP66 enclosure for permanent outdoor use.
Charge with a MID meter. Permanently connected.
| Charging power | up to 22 kW (32 A, three-phase), 11 kW on delivery |
|---|---|
| Connection | single-phase or three-phase, 230 to 415 V |
| Charging cable | fixed, Type 2, 6 m |
| Meter | MID-compliant |
| Connectivity | Wi-Fi 2.4 GHz, LAN (RJ45), LTE Cat-1 |
| Interfaces | OCPP 1.6, Modbus TCP, MQTT, HTTP API |
| Access | RFID 13.56 MHz, 1 RFID tag included |
| Residual current protection | 20 mA AC / 6 mA DC integrated, upstream at least type A 30 mA |
| Protection rating | IP66 |
| Operating temperature | −25 °C to +40 °C |
| Dimensions | approx. 18.6 × 29.7 × 9.9 cm |
| Weight | approx. 5.1 kg incl. cable |
Manufacturer: go-e GmbH, Satellitenstraße 1, 9560 Feldkirchen in Kärnten, Austria. Electronic contact: support@go-e.com.
Safety: Read and keep the product and installation documents in full before installation and use. Installation, connection, testing and commissioning may only be carried out by a qualified electrician in accordance with the manufacturer's instructions and locally applicable regulations. Verify that the installation is de-energised before any electrical work. Use the product only within the approved electrical and environmental conditions; do not continue to use it if there is visible damage or a safety-relevant fault. Follow the manufacturer's safety, recall and update notices.
Sales and delivery: currently only within Germany. Installation is not included unless expressly stated as part of the service.
Short answers on installation, connection and shipping.
Yes, a qualified electrician must carry out the installation. It is not included in the price unless it is expressly listed as part of the service. The same applies to mounting, commissioning and registration with the grid operator.
Yes. You must register charging equipment with your grid operator before commissioning. If the power exceeds 12 kVA (e.g. at 22 kW), the operator must approve it first. Your electrician usually handles the registration.
Yes. Sale and delivery are currently within Germany only, as stated in the product description.
For the statutory right of withdrawal, you bear the direct cost of returning the goods. Details are on our withdrawal page.
This wallbox comes with a tethered Type 2 charging cable, 6 m long.
Yes. According to the product data this wallbox has a MID-certified energy meter. Important: If you want to bill charging electricity to third parties (e.g. employees or tenants), you need a calibration-law compliant setup in Germany. A MID meter alone is not enough.
Yes. The product description mentions app control or smart connectivity for this wallbox.
Find out which rights you have under the legal guarantee.
Download now